Technical Notes
Flooring Technical Notes
Sub-floor Preparation
Prio to installation of Conductive / Dissipative / ESD Tile, it is important to ensure concrete subfloor is clean, flat and dry with moisture level of less than 5% measured by Tramex concrete moisture meter.